Building wraps
Building wraps are large-scale printed sheet materials that can be fixed to scaffolding structures and used to conceal building work. They are commonly digitally printed with a CGI rendering or photographic image of the building façade, attempting in some way to ‘blend in’ better with its context than traditional debris netting would.
It is a technique that is sometimes used on important buildings, or in sensitive locations, to hide unsightly scaffolding while providing a tantalising representation of what the building looks, or will look, like.
The benefits of building wraps are that they can help to reduce the spread of dust and other debris, conceal construction work from the public, and mean that views of the under-construction building is minimised.
The scaffolding must be securely erected for the building wrap to be installed. If necessary, engineers must calculate wind loading to be ensure that the installation of the wrap will not be a hazard to the scaffolding.
Building wraps are typically installed onto a 'picture frame' scaffold structure which projects about 300 mm further out than the last projected pole on the main scaffolding. Any projecting scaffold poles should be capped to cover sharp ends. This allows the wrap banner to move with the wind without getting caught on any poles which can cause damage.
Two commonly used fixing methods are standard and invisible:
- The standard method involves a picture frame that is made up of perimeter scaffolding with the wrap banner sitting about 150 mm inside the frame, fixed using 12 mm bungee cable (so the scaffold is visible).
- The invisible method is more difficult but is generally thought to give a better appearance. The wrap banner is pulled completely smooth, placed over the outside of the picture frame scaffolding and clamped using clamp couplers/joins.
Typically, the scaffolding picture frame is installed before printing the wrap, so that an accurately measured template can be provided to the designers. This ensures that the wrap covers the scaffold completely, that it is taut enough and does not crease.
Building wraps can serve as a form of discreet advertising, in the same way as hoardings. However, they may require planning permission from the local authority.
[edit] Related articles on Designing Buildings Wiki
- Architectural photography.
- Architectural reprography.
- Computer-generated imagery (CGI).
- Debris netting.
- Hoarding.
- Perimeter security.
- Rubble chute.
- Scaffolding.
[edit] External references
- Building wrap specialist: Project Print Management
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.

























